Folks,

Since 2002 SMTA has had an SMT Process Engineer Certification Program that was developed by Jim Hall, Phil Zarrow and me.  Some folks are a little nervous about taking the workshop and exam.  In light of this concern,  I have been asked by the Ohio SMTA chapter to give a 5 hour workshop on the types of problems one would be expected to solve.  I have proposed a list of problems to be covered in the workshop.  Here is a typical one that I might use.  See if you can do it.

Component placement is the limiting process in an SMT line for throughput.  Throughput (cycle time) is now one board every 50 seconds, when the line is running.  There is one chipshooter (CS) and one flexible placer (FP).  The bill of material (BOM) is 300 passives, 24 SICs (simple ICs), 8 CICs (complex ICs).  The chipshooter is taking 50 seconds and the flex placer 20 seconds.  All passives are being placed by the CS.  The FP places CICs in one second.  It places passives and SICs at the same rate. 

1. Maximum throughput will be obtained when the CS and FP take the same amount of time.  This can be accomplished by moving passives from the CS to the FP for placement.

   a. What is the minimum cycle time if the line is balanced?

   b. How many passives were moved to the FP to achieve this cycle time?
Note: We assume all other processes can keep up with the new and improved cycle time.
 
I will publish the solution in a few days.  I expect to be giving this workshop quite frequently in the future.
 
Solution:
 
The FP takes 20 seconds to place the SICs and the CICs.  The 8 CICs take 8 seconds, so the 24 SICs must take 12 seconds. Hence, the placement rate for SICs is 2 per second.   The CS places 300 passives in 50 seconds, so it places 6 passives a second.  Since the CS takes 50 seconds, to balance the line we must move passives to the FP.  Our goal is that the time spent by the CS is the same as the FP.   Let us assume that the number of passives we have to move to the CS is x, then time balancing can be expressed by the equation:
 
tcs = (300 -x)/ 6 sec = tfp = 20 secs + x/2, solving for x:  300 - x = 120 +3x  => 4x = 180  => x  = 45
 
So 45 passives are moved from the CS to the FP, hence the cycle time is now:   (300 -45)/6 = 42.5 sec.
 
The solution was quickly verified by LineSimulator(TM) software I developed.  If anyone would like a copy of this software tool, send me a note at RLasky@indium.com.
 
Cheers,
 
Dr. Ron

 

Tags:

Posted August 24th, 2008 by Dr. Ron Lasky | 0 Comments

Comments (add your comment)

    There are no comments on this entry yet.

Comment on this entry

optional (will not appear online)
http://yoursite – optional (will appear online)

captchaImportant! Please find the letters in the image opposite, then type them into the box above. You are asked to do this in order to verify that this comment is not being submitted by an automated process.

top of page

Blog Key/User Guide

Lijit

Using the power of people, their content, and their connections, Lijit enhances the way your readers search for and discover information on the internet.

Visit website to learn more.

LinkedIn

LinkedIn is an interconnected network of experienced professionals from around the world, representing 170 industries and 200 countries. You can find, be introduced to, and collaborate with qualified professionals that you need to work with to accomplish your goals.

Visit website to learn more

Email Author

Clicking the "Learn More, Email Author" button at the end of each blog entry, you can submit your questions and comments directly to the blogger.

Indium's bloggers cannot wait to hear from you!